08.05.2014 BiolDiv
From IMarine Wiki
(Difference between revisions)
(→User Interface) |
(→Next meetings) |
||
(One intermediate revision not shown) | |||
Line 36: | Line 36: | ||
==BiOnym paper== | ==BiOnym paper== | ||
- | * | + | * Overview: Fabio still to do. |
- | * | + | * GP added paragraph on the workflow. |
- | * | + | * Section 5. Nicolas has progressed, still need to complete 5.3. 5.2 to be merged with 5.1. |
- | * | + | * Gp to contact Edward for plans. |
- | + | ||
- | + | ||
- | + | ||
- | + | ||
- | + | ||
- | + | ||
- | + | ||
- | + | ||
- | + | ||
- | + | ||
- | + | ||
- | + | ||
- | + | ||
- | + | ||
+ | * Try to have a pre-final version for 15 May still. | ||
=Next meetings= | =Next meetings= | ||
- | Thursday | + | Thursday 15 May 2014, 10:00 am European time. |
Latest revision as of 09:00, 8 May 2014
Meeting 08 May 2014, 10:00 am
Google Hangout
Present: Fabio, Nicolas, Casey, Gianpaolo, Anton
Contents |
Notes
User Interface
- Running finally!!! The issue was a not-linked GWT class ... To be well documented for future developments in collaboration.
- Issue in documenting the processing: there should be an animated display showing the progress of the computation.
- When using the refresh button of the browser, both computation and configuring parameters are lost.
- Using Google Chrome Inspector, we could spot a FAILED information that is not caught and documented.
- Add controls in the box entry (e.g., limit the values of thresholds, etc.). Check the null entries.
- Possibly discretisation in a dropdown menu from 0.1 to 1.0.
- Dropdown menus in matcher selection to adapt the behaviour.
- We don't need NONE if red crosses are there.
- If algorithm fails, it should be reported.
- Infor (?) to be reviewed and completed (Preparsing has disappeared).
- Submit disabled until everything is correctly input in configuration.
- Ticket to be written by Casey.
- GP to organize a test plan to make the progressive basic testing.
BiOnym paper
- Overview: Fabio still to do.
- GP added paragraph on the workflow.
- Section 5. Nicolas has progressed, still need to complete 5.3. 5.2 to be merged with 5.1.
- Gp to contact Edward for plans.
- Try to have a pre-final version for 15 May still.
Next meetings
Thursday 15 May 2014, 10:00 am European time.