This WP7 Activity Report described the activities performed in August 2012 by Beneficiary and Task.

It is part of August 2012 Monthly Activity Report.

T7.1 Software Integration, Validation and Release

E-IIS Activities

In the reporting period E-IIS performed the following activities:

Contribution and editing to Deliverable D7.2 "Software Release Report". At the time of writing this report, the deliverable is under internal review.

New release procedures have been circulated to the TCOM mailing list. New procedures focus on a) release tickets to be released timely b) the need for a higher successful build ratio of HEAD components c) adoption of per-subsystem builds (already introduced with release 2.9.0)

On the capability to perform incremental builds (not building from source if components are unchanged) no good solution has been found so far: no way to install artifacts downloaded for binary components into the local Maven repository.

The HEAD configurations are monitored w.r.t. its build status. Issues have been tracked though and several issues been solved. At the time of writing, around 30 components are not building successfully.

Installation of the testing infrastructure is progressing. Besides the 3 infrastructure nodes, more machines are being added to create a testing VOVirtual Organization; leading to 8 more nodes. Furthermore, a portal is being installed and it's planned to use it to test portlet in release 2.10.


The beneficiary should report here major issues faced in the reporting period and the identified corrective actions, if any.


The beneficiary should report here a bullet list highlighting the main achievements of the reporting period

CNR Activities

The beneficiary should report here a summary of the activities performed in the reporting period


The beneficiary should report here major issues faced in the reporting period and the identified corrective actions, if any.


The beneficiary should report here a bullet list highlighting the main achievements of the reporting period

T7.2 Software Distribution and Documentation

NKUA Activities

NKUA has been working on the deliverable D7.2 filling the sections about Documentation, Javadoc Status and gCube guide status.

The news for the minor release of gCube 2.9.1 release have been published and are available here.

Furthermore, we have updated the gCube Distribution site for 2.9.1 release by inserting in the database the corresponding entry.


None


News for version 2.9.1 has been published

CNR Activities

The beneficiary should report here a summary of the activities performed in the reporting period


The beneficiary should report here major issues faced in the reporting period and the identified corrective actions, if any.


The beneficiary should report here a bullet list highlighting the main achievements of the reporting period

E-IIS Activities

The beneficiary should report here a summary of the activities performed in the reporting period


The beneficiary should report here major issues faced in the reporting period and the identified corrective actions, if any.


The beneficiary should report here a bullet list highlighting the main achievements of the reporting period