2012.03 WP5: iMarine Data e-Infrastructure Deployment and Operation Monthly Activity By Task and Beneficiary

From IMarine Wiki

Jump to: navigation, search

Contents

This WP5 Activity Report described the activities performed in March 2012 by Beneficiary and Task.

It is part of the March 2012 Activity Report.

T5.1 iMarine Data e-Infrastructure Operation

CERN Activities

CERN coordinated, planned and performed the infrastructure upgrade to gCube 2.8.0 which included the installation of the new iMarine Gateway (https://portal.i-marine.d4science.org ). Together with the upgrade of the infrastructure, the INSPIRE VOVirtual Organization; has been decommissioned and some of the resources moved to the Ecosystem VOVirtual Organization; , including the HEPGateway VRE.

Some issue related to iMarine portal crash and SMS protocol resolution inside tomcat6 has been investigated and a Production conf call has been organized.

The status and the plan for WP5 has been presented during iMarine TCOM meeting.


None


Infrastructure upgrade to gCube 2.8.0

INSPIRE VOVirtual Organization; Decommissioned

CNR Activities

CNR supported the infrastructure upgrade to gCube 2.8.0 by upgrading gHNs at its site.

CNR supported the INSPIRE VOVirtual Organization; decommissioning reinstalling its gHNs


none


Infrastructure upgrade to gCube 2.8.0

T5.2 iMarine Data e-Infrastructure Nodes Provision

CNR Activities

CNR has been keeping up and running the part of the D4Science Ecosystem infrastructure hosted at its site. One additional node (rstudio.p.d4science.research-infrastructure.eu) equipped with Tomcat 6.0.35 and the Tomcat Virtual Platform has been joined to the e-Infrastructure in order to support the deployment of a new Web Application bridging R-Studio to the Ecosystem.


None to report


  • Maintained the provided infrastructure operational
  • One additional node (rstudio.p.d4science.research-infrastructure.eu) equipped with Tomcat 6.0.35 and the Tomcat Virtual Platform has been joined to the e-Infrastructure

NKUA Activities

NKUA has been keeping up and running the provided nodes hosting GHNs and upgraded them to gCube 2.8.0


None


  • Maintained the provided infrastructure operational
  • Upgraded NKUA's infrastructure to gCube 2.8.0

FAO Activities

Both Nodes in FAO were upgraded to gHN 3.2.6


None


Both Nodes in FAO were upgraded to gHN 3.2.6

FIN Activities

Coordination with IT team of GEOMAR regarding server issues


Server in Kiel node reported a controller failure; server can not be restarted. External support from Transtec-Support ongoing.


none

T5.3 iMarine Data Infrastructure Availability, Monitoring and Accounting

CERN Activities

CERN has worked on the extension of the Messaging consumer and Portal accounting portlet to integrate new accounting data, in particular Template/report, WebApp Management and Documents Workflow.

In addition the solution for Resource Usage Tracking developed by ENG in VENUS-C has been evaluated and a presentation has been given during the iMarine TCom to present the integration steps within gCube.


None


The integration of the Usage Tracker system developed for VENUS-C has been scheduled during the TCOM

Personal tools