This WP5 Activity Report described the activities performed in January 2012 by Beneficiary and Task. It is part of January 2012 Activity Report.

T5.1 iMarine Data e-Infrastructure Operation

CERN Activities

The activities performed by CERN during the project M3 can be summarized as follows:

  • The deliverable D5.1 has been completed and after the SB approval has been sent to the EC.
  • Achievement of the milestones M25 and MS27
  • The D4Science Ecosystem has been continuously monitored and several tickets have been opened and monitored


The D5.1 deliverable is of type Other ( wiki ) and it will be extended till March 2012 to complete the definition of the D4Science Infrastructure policies.


  • D5.1 completed and sent to EC
  • MS25 and MS27 achieved.

CNR Activities

None


None


None

T5.2 iMarine Data e-Infrastructure Nodes Provision

CNR Activities

CNR has been keeping up and running the part of the D4Science Ecosystem infrastructure hosted at its site. Besides the usual monitoring and backup activities, two incident ticket were managed in the reporting period:

  • ticket #372, reporting that a hardware fault occurred on a physical machine hosting several virtual machines deactivating part of the CNR site. In response to the problem, a new physical machine with the same capabilities was prepared and the related VMs were promptly migrated there. The gHN containers and the services running on that machines where also recovered from the fault along their states.
  • ticket #373 was managed by CNR during the reporting period in order to recover from its backup storage the state of a Content Manager instance (node38.p).


None


  • Maintained the provided infrastructure operational
  • Recovery from an hardware fault involving 14 nodes at CNR site (ticket #372)
  • Restore of a backup of a Content Manager instance (ticket #373)

NKUA Activities

NKUA has been keeping up and running the provided nodes hosting GHNs and glite. Additionally provided gcube wiki maintenance.

In this time have taken immediate corrective actions for any issues that occurred.

Meanwhile planned the upgrade of glite3.2 middleware services to UMD, which will start at the end of January.


n/a


During January NKUA :

  • Fixed incident regarding hardware problem
  • Maintained the provided infrastructure operational
  • Maintained gcube wiki and fixed template issue that occured

FAO Activities

No activities to report.

The beneficiary should report here major issues faced in the reporting period and the identified corrective actions, if any.


The beneficiary should report here a bullet list highlighting the main achievements of the reporting period

FIN Activities

The beneficiary should report here a summary of the activities performed in the reporting period


The beneficiary should report here major issues faced in the reporting period and the identified corrective actions, if any.


The beneficiary should report here a bullet list highlighting the main achievements of the reporting period

T5.3 iMarine Data Infrastructure Availability, Monitoring and Accounting

CERN Activities

No activities to report